Case studies list

Reducing costs due to raw material consumption

Six Sigma Green Belt program in heavy industry
Customer: Major manufacturer in the metallurgical industry

Read this case study

Increasing production capacity

Project: Increasing production capacity
Client: Supplier level 2 automotive industry (pressing + mechanical processing + manual assembly)

Read this case study

Support provider - Late Delivery

Project: Elimination of delivery delays
Client: Level 2 supplier to the automotive/textile industry

Read this case study

VSM consultancy project

Project: VSM Consulting
Client: Major manufacturer of industrial equipment

Read this case study

ISO/TS to IATF Transition

Project: Supporting the transition from ISO/TS to IATF
Client: Global producer of exhaustion systems for vehicles, Tier 1 supplier

Read this case study

Evaluation of existing risk analyzes of production processes

Project: Detailed analysis and improvement of the existing P-FMEA – Reverse FMEA
Customer: Global manufacturer of safety elements for vehicles

Read this case study

Improving the product functioning conditions

Project: Automotive industry consulting
Customer: Important manufacturer in the automotive field

Read this case study

Consultancy for automotive industry (eliminating non-conformities form cracked tubes)

Project: Automotive industry consultancy
Client: An important component manufacturer for the automotive industry

Read this case study

Consultancy, preparation of ISO 9001 implementation

Project: Process improvement and preparation preparation ISO 9001: 2015
Client: manufacturer of injection molded parts (up to 50 employees)

Read this case study

Consultancy for IATF 16949 Implementation

Project: Implementation consultancy IATF 16949: 2016
Client: automotive systems manufacturer, Tier 1 supplier (up to 100 employees)

Read this case study

Consultancy for IATF 16949 Implementation

Project: Implementation consultancy IATF 16949: 2016
Client: manufacturer of systems for automotive industry, Tier 1 supplier (over 1000 employees)

Read this case study

Consultancy for IATF 16949 Implementation

Project: Implementation consultancy IATF 16949: 2016
Client: manufacturer of systems for the automotive industry, Tier 1 supplier (over 500 employees)

Read this case study

Material flow project

Project: Consultancy for improving the flow of materials, information flow, streamlining the activities of the raw material deposit and finished products
Client: Major manufacturer of Automotive components

Read this case study

Project for inventory efficiency

Project: Production Flow Evaluation for Stock and Storage Efficiency in the Section
Client: Major Automotive Equipment Manufacturer

Read this case study

VSM Project

Project: VSM (Eagle Eye)
Client: Major manufacturer of industrial equipment

Read this case study

Six Sigma Project

Project: Root cause analysis
Client: Global Manufacturer of Industrial Equipment

Read this case study

Unique Lean Manufacturing Implementation

Starting 2014 we participated in the implementation of Lean manufacturing techniques for Inteliform, a manufacturer of industrial molds in Timisoara. The implementation was conducted with EBRD financing (consultancy programm for small businesses in Romania).

Read this case study

Operational improvements with Six Sigma

For details visit the link below

Read this case study

Implementing Lean Management System

For details visit the link below

Read this case study

FMEA Trainings

For details visit the link below

Read this case study
This website uses cookies according to our Cookies Policy. Close this notification
Address: Bd. Decebal, nr. 18, ap. 2
310133 - Arad, jud. Arad, Romania
Phone: +40 357 805 456
E-mail: office@effectiveflux.com
You cand follow us on:
Access the latest information:
Terms and Conditions / Privacy Policy / Cookie Policy